LEMBAGA KEMAJUAN JOHOR TENGGARA
JADUAL TAWARAN TENDER / SEBUTHARGA / ARAHAN KERJA
 
     
  TAWARAN : LKJT/UT/KG. TERSUSUN MAWAI BARU/P/2019/SH2308
    CADANGAN KERJA-KERJA MENAIKTARAF SURAU DI KG. TERSUSUN MAWAI BARU, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TA'ZIM.
 
 
No. Petender
Harga Tawaran (RM)
Tempoh Kerja (Minggu)
15/17

88,500.00

5 Minggu
3/17

89,437.00

6 minggu
9/17

94,910.00

08
8/17

96,950.00

6 MINGGU
14/17

102,656.00

7
13/17

114,304.00

5 minggu
17/17

115,000.00

8
12/17

115,570.00

10
11/17

117,000.00

8
6/17

118,709.40

7
10/17

119,610.00

8
1/17

127,664.00

8 minggu
5/17

128,869.00

6
2/17

128,964.00

10minggu
7/17

129,266.00

7 MINGGU
16/17

131,047.00

9
4/17

131,290.00

10

 
JUMLAH TAWARAN DITERIMA : 17