kejora

LKJT/KWPP/KG.TG.SURAT/P/2025/SH2791(PANGGILANSEMULAKALIKE2)

CADANGAN KERJA-KERJA MENYIAPKAN BAKI KERJA DUA (2) UNIT TEMPAT LETAK BUGGY DAN LIMA (5) UNIT TEMPAT LETAK BASIKAL DAN KERJA-KERJA BERKAITAN DI PULAU TANJUNG SURAT, MUKIM TG SURAT, DAERAH KOTA TINGGI, JOHOR DARUL TA'ZIM.

No. Petender Harga Tempoh (Minggu)
4/ 12 5,000.00 15
1/ 12 70,216.00 15
3/ 12 72,750.00 16
6/ 12 73,777.00 15
5/ 12 74,988.00 15
2/ 12 81,061.20 10
7/ 12 85,576.00 16
8/ 12 86,224.00 16
10/ 12 87,644.00 16
9/ 12 87,728.00 15
11/ 12 188,709.40 16
12/ 12 189,563.00 16
Showing entries (filtered from total entries)